StoryManufacturing
HiTHIUM's Heze park, built only for long-duration storage, begins mass production
HiTHIUM began production at its Heze base in Shandong, an 80-hectare, RMB 13 billion park covering materials, LFP cells and system assembly for long-duration storage. Phases I and II are running and make 1,000 Ah-class products on lines of over 15 GWh each.
- Single lines exceed 15 GWh with over 95% automation.
- Versus the prior generation: 50% less floor space per GWh, 58% fewer workers, 13% less energy.
- Investment above RMB 13 billion (about $1.9 billion).