The brief
- The global leader in second-generation (2G) HTS tape production, having supplied over 8,000 kilometres to fusion start-ups since 2019.
- Zama factory (opened 2024) has a design capacity of 1,000 km of 12-mm tape per year.
- Signed basic agreement with SWCC (Aug 2026) on data center cable systems; targeting 2030 commercialisation.
Technical approach
Second-generation tape production
Uses ion-beam deposition for template, pulsed laser for REBCO layer, silver sputtering and copper plating.
Industrial manufacturing capacity
Operates in Tokyo and Kanagawa; the Zama facility (opened 2024) is designed to produce up to 1,000 km of tape per year with room to scale further.
Fusion, power and specialty magnets
Supplies to fusion, power grids, wind and medical devices. Key supplier for fusion reactor magnets.

