StoryHardware
Dogger Bank C selected for Haliade-X 14 MW offshore turbines
GE VernovaHaliade-X Dogger Bank
GE Renewable Energy selected its upgraded Haliade-X 14 MW turbine for Dogger Bank C (87 units), marking the first commercial deployment of the 14 MW model. The 14 MW upgrade produces 200 MW more than the 13 MW turbines used in Dogger Bank A and B (190 units combined), allowing the farm to reach 3.6 GW with optimized turbine placement.