Milestones
- Aalo-X critical test resultsTarget 2027Current milestone.
- First Aalo Pod deploymentTarget Dec 2029Not yet reached.
Upcoming
- 2027Aalo-X critical test results (next)
- Dec 2029First Aalo Pod deployment
50 MWe: five Aalo-1 units, three shared turbines. Factory-built, <1 year install. 3¢/kWh target.
Planned for deployment at Crusoe data centres by end of 2029.
Checked 10 Oct0 updates this week
Five share three turbines. Redundancy allows maintenance.
Factory modules, onsite assembly. vs 5+ years.
Sized for compute clusters. Reduces transmission loss.
| Spec | Aalo Pod |
|---|---|
| Total electric capacity | 50 MWeR (reported) |
| Aalo-1 reactors per Pod | 5R (reported) |
| Turbines per Pod | 3R (reported) |
| Power per Aalo-1 | 10 MWeR (reported) |
| Target installation time | Less than 1 yearR (reported) |
| Target electricity cost | 3¢/kWhR (reported) |
R reported by the company
Aalo Atomics
Fast reactors, sodium-cooled, mass manufacturing, AI data centres
Aalo Atomics develops mass-manufactured sodium-cooled fast reactors for data centres. Founded 2023, reached criticality 4 July 2026. Partners with Crusoe Energy.