TerraPower

Natrium sodium fast reactor, molten salt storage

USprivateest. 2008terrapower.com (opens terrapower.com)Checked 25 Sep

The brief

Analyst view
  • Won its NRC construction permit in March 2026 and started nuclear construction in April 2026.
  • Molten-salt tanks sit between reactor and turbine, so a 345 MWe reactor can peak at 500 MWe.
  • Operation targeted for 2030, slipped from 2028 mainly by a shortage of HALEU fuel.

Technical approach

As reported
Reactor

Sodium-cooled fast reactor

Liquid sodium cools the core at normal pressure. It boils at 883 °C, far above operating heat, so there is no high-pressure coolant to leak.

Fuel

Metal HALEU fuel

Uranium-zirconium metal fuel enriched to under 20% (HALEU), based on decades of EBR-II experience. It burns more of its fuel than water reactors.

Storage

A molten-salt heat battery

Reactor heat is stored in tanks of hot salt, as at solar plants. Drawing on them lets output surge to 500 MWe for 5+ hours.

Safety

Cooling without pumps

Air flowing naturally around the reactor vessel removes leftover heat, with no pumps or operators needed.

Programs

TerraPower, two programs

Updated 19d ago
Research · Proto · Pilot · Deploy · Scaling

Research & demos

1 item

Open technical problems

Open · Active · Partial
  • HALEU fuel supplyActive research

    The US has almost no commercial HALEU enrichment since Russian supply was cut off, pushing Natrium from 2028 to 2030.

  • Handling sodium at scalePartially solved

    Sodium reacts violently with water and burns in air, so leaks must be prevented for decades.

Upcoming catalysts

Company-wide
  • 2027Operating licence application to the NRCNatrium (Kemmerer Unit 1)by ~15 mo
  • 2028Molten Chloride Reactor Experiment expected to run at INL for about six monthsMolten Chloride Fast Reactorby ~27 mo
  • 2030Natrium commercial operationNatrium (Kemmerer Unit 1)by ~51 mo

Peers

Fission · 4

Company & funding

2 rounds · as reported
Raised
$1.4Bdisclosed private rounds
Last round
Equity raiseJun 2025
HQ
US
Founded
2008
DateRoundAmountPost-moneyLead
Jun 2025Equity raise$650M——
Aug 2022Equity raise$750M—SK Inc., Bill Gates