Natrium (Kemmerer Unit 1)TerraPower—Natrium (Kemmerer Unit 1)TerraPower—Natrium (Kemmerer Unit 1)TerraPower—Natrium (Kemmerer Unit 1)TerraPower—TerraPower—Natrium (Kemmerer Unit 1)TerraPower—
Natrium (Kemmerer Unit 1)
Photo: Stan Mogard · CC BY-SA 4.0 (opens commons.wikimedia.org)

Natrium (Kemmerer Unit 1)

by TerraPowerUS

PilotStage 3 of 5

NRC construction permit granted March 2026; nuclear construction began April 2026; operation targeted 2030.

Updated 19d agoChecked 25 Sep0 updates this week

Milestones

Next · Nuclear island construction
  1. Kemmerer selected as first Natrium siteNov 2021Complete.
  2. Non-nuclear construction beginsJun 2024Complete.
  3. NRC dockets construction permit applicationMay 2024Complete.
  4. NRC completes safety reviewDec 2025Complete.
  5. NRC construction permit issuedMar 2026Complete.
  6. Nuclear island constructionTarget Apr 2026Current milestone.
  7. Commercial operationTarget 2030+24 mooriginally 2028Not yet reached.

Most important updates

  • 19d ago
  • 31 Aug 2026
  • Apr 2026
  • 4 Mar 2026
  • 10 Jun 2024

Upcoming

  1. Apr 2026Nuclear island construction (next)
  2. 2027Operating licence application to the NRC
  3. 2030Commercial operation+24 mooriginally 2028

Current obstacles

  • HALEU for the first coreThe first fuel depends on new US enrichment and conversion plants that are still being built.
  • First-of-a-kind cost and scheduleThe US hasn't built a commercial sodium fast reactor in decades, so costs, supply chains and schedule are uncertain.

Physics limits

  • Sodium burns in air and reacts with waterLiquid sodium is an excellent coolant but ignites in air and reacts violently with water, so pipes need leak protection and the steam side must stay separate, here via a salt loop.
  • Fast reactors need more enriched fuelWithout a moderator slowing neutrons, each neutron is less likely to cause fission, so the core needs HALEU enriched up to 19.75% uranium-235, versus about 5% in ordinary reactors.
  • Stored heat is bounded by salt temperaturesMolten nitrate salt freezes near 220 °C and breaks down above ~600 °C. That window and tank size cap storage, so the boost to 500 MWe lasts about 5.5 hours, not days.

How it works

3 parts
A molten salt storage tank being built at the Solana solar plant, Arizona: Natrium stores reactor heat in tanks like these
A molten salt storage tank being built at the Solana solar plant, Arizona: Natrium stores reactor heat in tanks like thesePhoto: ENERGY.GOV · Public domain (opens commons.wikimedia.org)
Core

Fast fission in metal fuel

Fast neutrons keep the chain reaction going in a compact metal-fuel core that sits in a pool of liquid sodium.

Heat transfer

Sodium heats molten salt

A second sodium loop carries heat out to warm nitrate salt, so the steam plant stays non-nuclear.

Storage

Hot and cold salt tanks

Hot salt is stored in tanks; drawing it faster than the reactor refills them lets the plant peak at 500 MWe.

Spec sheet

SpecNatrium (Kemmerer Unit 1)
Reactor electrical output345 MWeR (reported)
Peak output with storage500 MWeR (reported)
Boost duration5.5+ hoursR (reported)
Primary coolantLiquid sodiumR (reported)
FuelMetallic HALEU (<20% U-235)R (reported)
Storage mediumMolten nitrate saltR (reported)

R reported by the company

Papers & demos

1 item
  1. Mar 2024paper
    Kemmerer Unit 1 construction permit application and preliminary safety analysis (opens nrc.gov)First commercial non-light-water reactor application the NRC accepted for review in over 40 years.

Update log

8 updates

Mon 21 Sep

  • Minor: PressCommercial

Mon 31 Aug

  • Minor: PressCommercial

Apr 2026

  • Major: PressManufacturing

Wed 4 Mar

  • Major: RegulatorRegulatory

Tue 4 Nov 2025

  • Minor: PressResearch

Mon 10 Jun 2024

  • Major: PressManufacturing

Dec 2022

  • Major: PressOther

Tue 16 Nov 2021

  • Major: PressCommercial

About TerraPower

The team behind Natrium (Kemmerer Unit 1)

TerraPower

Natrium sodium fast reactor, molten salt storage

Nuclear company founded by Bill Gates. Its Natrium plant in Kemmerer, Wyoming pairs a 345 MWe sodium-cooled reactor with molten-salt heat storage that can boost output to 500 MWe. In March 2026 it won the first NRC construction permit for a commercial reactor not cooled by ordinary water.

  • Won its NRC construction permit in March 2026 and started nuclear construction in April 2026.
  • Molten-salt tanks sit between reactor and turbine, so a 345 MWe reactor can peak at 500 MWe.
  • Operation targeted for 2030, slipped from 2028 mainly by a shortage of HALEU fuel.
Founded
200818 yrs
Headquarters
United States
Status
Private
Valuation
private
Raised
$1.4B2 rounds
Last round
Equity raise · $650MJun 2025
Works in
EnergyFission
Coverage
2 programs · 14 updateslatest 19d agochecked 25 Sep
Lead investors
SK Inc.Bill Gates
Customers
Meta
Primer