The brief
- Builds Starliner, NASA's second crew capsule; on its 2024 crew test thrusters failed and the crew flew home on Dragon.
- Next Starliner flight is cargo-only (Dec 2026 to Jan 2027); crewed flights are due to resume in 2028.
- Builds the core stage of NASA's SLS rocket, which launched Artemis II in April 2026.
Technical approach
Four RS-25 engines and massive fuel tank
RS-25 engines produce 512,300 lbf vacuum thrust each. Core carries 537,000 gallons liquid hydrogen, burns with liquid oxygen at 500+ kg/s.
27 metric tons to trans-lunar injection (TLI)
98 m tall with Orion and launch abort system. Four RS-25 engines plus two five-segment solid rocket boosters generate 39 MN total thrust.
Michoud Assembly Facility, New Orleans
Boeing assembles SLS cores at Michoud, the same facility that built Space Shuttle external tanks. Recent modernization improves production rates.

