StoryManufacturing

IperionX fully commissions Virginia facility production systems

IperionXVirginia Titanium Manufacturing Campus

IperionX reported full commissioning of all critical systems at Virginia facility including powder metallurgy equipment tripling powder capacity. Facility transitioned to 24/7 operations.

  • All production systems fully commissioned Sept 2025
  • Powder metallurgy capacity tripled
  • 24/7 continuous operations achieved
Read the original · Press

More on Virginia Titanium Manufacturing Campus

Primer