HomeFull speed ahead. Keep track of advancements in every frontier
Instinct MI450 / HeliosAMD—Instinct MI450 / HeliosAMD—

Instinct MI450 / Helios

by AMDUS

PilotStage 3 of 5

Launched in 2026. First OpenAI Helios capacity expected online in Q4 2026.

Updated Jul 2026Checked 25 Sep0 updates this week

Milestones

Next · First OpenAI Helios capacity online
  1. Helios previewed at Advancing AI12 Jun 2025Complete.
  2. OpenAI 6 GW agreement6 Oct 2025Complete.
  3. Oracle 50,000-GPU MI450 plan announced14 Oct 2025Complete.
  4. Helios launched at Advancing AI 2026Jul 2026Complete.
  5. First OpenAI Helios capacity onlineTarget Q4 2026Current milestone.
  6. Instinct MI500 generationTarget 2027Not yet reached.

Most important updates

  • Jul 2026
  • 14 Oct 2025
  • 6 Oct 2025
  • 31 Mar 2025

Upcoming

  1. Q4 2026First OpenAI Helios capacity online (next)
  2. 2027Instinct MI500 generation

Current obstacles

  • Scale-up fabric maturityLinking GPUs over Ethernet is newer than NVLink. It must prove it stays fast under heavy AI traffic.
  • HBM4 supplyAMD competes with NVIDIA for limited HBM4 output from SK hynix, Samsung and Micron.

Physics limits

  • Huge currents at low voltageGPUs run below 1 volt, so a chip drawing over 1,000 W pulls more than 1,000 amps. Delivering that without big losses needs thick copper and voltage conversion right beside the chip.
  • Memory density grows slowlyMemory per GPU grows only as fast as DRAM density and stack height, and DRAM cells have shrunk slowly in recent generations. Bigger models therefore need more GPUs, not just bigger ones.
  • Heat per rackA rack of 72 top GPUs dissipates well over 100 kW. Liquid cooling can carry it away, but hot spots on each chip are approaching the limit of what cold plates can remove.

How it works

3 parts
An open cabinet of Frontier, an AMD-GPU supercomputer at Oak Ridge, not Helios: liquid-cooled GPU blades packed into one rack, the idea Helios scales up
An open cabinet of Frontier, an AMD-GPU supercomputer at Oak Ridge, not Helios: liquid-cooled GPU blades packed into one rack, the idea Helios scales upPhoto: Oak Ridge National Laboratory · CC BY 2.0 (opens commons.wikimedia.org)
GPU

Chiplet GPU with HBM4

Each MI455X joins compute chiplets with 12 HBM4 memory stacks, more memory than rival GPUs.

Scale-up

UALink over Ethernet

GPUs in the rack talk over standard Ethernet switches using the open UALink protocol.

Scale-out

Pensando NICs

AMD's Pensando network cards link racks into clusters of many thousands of GPUs.

Spec sheet

vs MI355X
SpecInstinct MI450 / HeliosMI355XChange
HBM4 per GPU432 GBR (reported)288 GB HBM3E▲ 144 GB
Memory bandwidth per GPU19.6 TB/sR (reported)8 TB/s▲ 11.6 TB/s
FP4 compute per GPU40 PFLOPSR (reported)——no comparable change
GPUs per rack72R (reported)——no comparable change
Rack FP4 compute2.9 exaflopsR (reported)——no comparable change
Rack HBM431 TBR (reported)——no comparable change

R reported by the company

Papers & demos

1 item
  1. Sep 2025code
    ROCm 7Big software release adding MI350 support and faster inference.

Update log

4 updates

Jul 2026

  • Major: PressHardware

Tue 14 Oct 2025

  • Minor: PressCommercial

Mon 6 Oct 2025

  • Major: PressCommercial

Mon 31 Mar 2025

  • Minor: PressOther

About AMD

The team behind Instinct MI450 / Helios

AMD

Instinct GPUs, Helios racks, EPYC CPUs

AMD designs CPUs and GPUs and is NVIDIA's main rival in AI chips. It pioneered building chips from smaller pieces (chiplets). Its Helios rack, backed by a 6 GW OpenAI deal, is its first full-rack AI system.

  • OpenAI agreed to deploy 6 GW of AMD GPUs (Oct 2025) and got a warrant for up to 160M AMD shares.
  • Helios racks with 72 GPUs launched in 2026. First OpenAI capacity due online in Q4 2026.
  • Bought ZT Systems (closed March 2025) to learn how to build whole racks.
Founded
196957 yrs
Headquarters
United States
Status
Public
Valuation
public
Staff
~28,000Dec 2024
Works in
ComputingAI chipsAI
Coverage
2 programs · 10 updateslatest 1 Jul 2026checked 25 Sep
Customers
OpenAIOracleMeta
Suppliers
TSMC
Primer