FugakuNEXT

by RIKENJP

Give Japanese science and industry a machine about 100 times faster than Fugaku on real applications, within the same ~40 MW, by fusing simulation with AI.

ResearchStage 1 of 5

Basic design done Feb 2026 (report May 2026); detailed design under way, operation around 2030.

Updated 29 May 2026Checked 11 Oct0 updates this week

Milestones

Next · Detailed design phase
  1. MEXT launches the FugakuNEXT projectJan 2025Complete.
  2. Fujitsu wins basic design contract18 Jun 2025Complete.
  3. NVIDIA joins; international initiative launched22 Aug 2025Complete.
  4. Basic design completedFeb 2026Complete.
  5. Detailed design phaseTarget 2026Current milestone.
  6. System begins operation in KobeTarget 2030Not yet reached.