Stegra

Hydrogen green steel, Boden plant

SEprivateest. 2020stegra.com (opens stegra.com)Checked 25 Sep

The brief

Analyst view
  • The furthest-along attempt at a commercial hydrogen steel mill; total financing is close to €8B.
  • Cost overruns caused a 2025 cash crunch, fixed by a €1.4B equity round led by Wallenberg Investments (closed June 2026).
  • Start-up slipped from 2025 to a phased 2026 start, full ramp 2027; all 37 electrolyser modules were in by April 2026.

Technical approach

As reported
Hydrogen

Makes its own hydrogen

About 700 MW of electrolysers use Swedish hydro and wind power to split water into hydrogen on site, so no pipeline is needed.

Reduction

Hydrogen instead of coal

In a tall furnace, hydrogen pulls the oxygen out of iron ore pellets, leaving solid 'sponge iron' (DRI) and water vapour instead of CO2.

Melting

Electric arc furnaces

The iron and some scrap are melted with renewable electricity, then cast and rolled into steel coils on the same site.

Integration

Ore to coil on one site

Doing every step in one place saves heat and transport, but makes the whole project one very large construction risk.

Programs

Stegra, one program

Updated 23d ago
Research · Proto · Pilot · Deploy · Scaling

Open technical problems

Open · Active · Partial
  • Cost of green hydrogenActive research

    Hydrogen is the biggest running cost. Power prices and electrolyser uptime decide if the steel can match coal-based steel on price.

  • Ore quality for DRIOpen

    The hydrogen route needs very pure iron ore pellets, and there isn't much of that ore, which limits how many such plants can be built.

  • First-of-a-kind start-upOpen

    Nobody has started hydrogen making, a hydrogen furnace and a steel shop together at this scale; teething problems are likely.

Upcoming catalysts

Company-wide
  • 2027Full-scale production rampBoden green steel plantby ~15 mo

Peers

Green steel · 1

Company & funding

2 rounds · as reported
Raised
$1.6Bdisclosed private rounds
Last round
Equity round24 Jun 2026
HQ
SE
Founded
2020
DateRoundAmountPost-moneyLead
24 Jun 2026Equity round$1.6B—Wallenberg Investments
Jan 2024Project financing (debt, equity, grant)$7B——

Partners & customers

2 suppliers · 1 investor · 1 partner

People

Key people
  • Henrik HenrikssonCEO
  • Harald MixCo-founder