The brief
- Won a $30M NASA contract in Sep 2025 to boost the decaying Swift observatory, and launched LINK about nine months later.
- LINK spun out of control after launch, never captured Swift and reentered in Sep 2026, but tested its arms and thrusters.
- Raised $12M in June 2026; next aims a servicing craft (NEXUS) at high geostationary orbit, planned for 2027.
Technical approach
Grab satellites never built to be grabbed
Robotic arms with grippers hold onto existing parts of a satellite, so old spacecraft without docking ports can still be serviced.
Electric thrusters for slow, efficient pushes
Xenon electric thrusters fling charged gas out very fast on little propellant, so the servicer can raise a heavy client's orbit over months.
Build in months, not years
Through an existing NASA small-business contract route, LINK was designed, built, tested and launched in under nine months.
Life extension and upgrades
Its planned NEXUS craft would reposition, repair, refuel or refit satellites already in orbit.
