StoryManufacturing

Tesla Semi volume production begins at Nevada Gigafactory; Standard Range and Long Range variants ramping

TeslaTesla Semi

Tesla achieved volume production of the Tesla Semi at its Nevada Gigafactory starting April 29, 2026, ramping from pilot builds to high-volume assembly. The Semi is available in two variants: Standard Range (325 miles) and Long Range (500 miles), both with 1.7 kWh/mile efficiency and powered by three rear motors totaling 800 kW. Peak charging reaches 1.2 MW, recovering 60% battery in 30 minutes.

  • Standard Range: 325 miles, under 20,000 lbs, designed for regional hauls.
  • Long Range: 500 miles, approximately 23,000 lbs, with 1.2 MW charging for long-haul routes.
  • Both carry 82,000 lb gross combination weight at 1.7 kWh/mile efficiency.
  • Production ramping toward 50,000 units annually at Nevada facility.
Read the original · Press

More on Tesla Semi

Primer