Milestones
- Pilot produces first hydrogen-reduced sponge ironJun 2021Complete.
- Hydrogen storage pilot extended to 2031Jan 2025Complete.
- Large-scale hydrogen storage testing completedFeb 2025Complete.
by SSAB / LKAB / Vattenfall (HYBRIT)SE
First industrial-scale fossil-free steel plant using hydrogen. Demo facility in Gällivare produces hydrogen-reduced sponge iron for refining into finished steel.
Pilot proved technology in 2021. Gällivare demonstration plant under development in Vitåfors.
Updated Jun 2021Checked 10 Oct0 updates this week
600 MW electrolyzer powered by wind and hydropower splits water into hydrogen and oxygen.
Hydrogen gas removes oxygen from iron ore, leaving sponge iron. Hydrogen becomes water, not CO2.
Sponge iron melts and refines into finished steel using fossil-free energy. Skips the blast furnace.
| Spec | HYBRIT hydrogen direct reduction |
|---|---|
| Demo plant design capacity | 1.3 Mt/yr sponge ironR (reported) |
| Pilot output (June 2021) | ~100 tonnesR (reported) |
| Electrolysis capacity | 600 MWR (reported) |
R reported by the company
SSAB / LKAB / Vattenfall (HYBRIT)
Hydrogen direct reduction, fossil-free steel
Joint venture of Swedish steel maker SSAB, mining company LKAB, and energy company Vattenfall to develop fossil-free steel using hydrogen. Produced first hydrogen-reduced sponge iron in 2021; building demo plant in Gällivare.
hybritdevelopment.se (opens hybritdevelopment.se)Company profile →