Milestones
- First GB200 NVL72 cloud instances generally availableFeb 2025Complete.
- More than 1.85 GW active powerTarget Dec 2026Current milestone.
Most important updates
- 11 Aug 2026
- 25 Sep 2025
- Sep 2025
- 28 Mar 2025
- Mar 2025
Upcoming
- Dec 2026More than 1.85 GW active powerin about 7 weeks (next)
Current obstacles
- Leverage and customer concentrationGrowth is funded with heavy debt, backed by contracts from a handful of AI customers.
- Power and construction delaysDelays at outside data-center builders have pushed back capacity and revenue.
Physics limits
- Light is too slow for spread-out clustersTraining jobs synchronise tens of thousands of GPUs many times a second. Light in fibre takes about 5 µs per km, so one training cluster must sit on one campus, and the slowest link sets everyone's pace.
- Failures scale with sizeWith 100,000 GPUs, some part fails every few hours. Jobs must save checkpoints and restart, so reliability, not peak speed, often limits useful throughput.
- All the power becomes heatAn AI rack draws over 100 kW, and nearly all of it ends up as heat that liquid cooling must carry away. Available power and cooling, not chips, often cap how fast capacity grows.
How it works

Newest NVIDIA racks first
CoreWeave builds clusters of the latest NVIDIA systems (GB200, GB300) with InfiniBand networks, and is often first to offer them.
Managed bare metal
Customers get near-bare-metal performance run through Kubernetes, with tools that detect failing GPUs and swap them out automatically.
Contracts fund the GPUs
Multi-year contracts with customers such as Microsoft, OpenAI and Meta serve as collateral for loans used to buy GPUs and build sites.
Update log
Tue 11 Aug
- Minor: PressCommercial
Thu 30 Oct 2025
- Minor: FilingOther
Thu 25 Sep 2025
- Major: BlogCommercial
Sep 2025
- Major: FilingCommercial
Fri 28 Mar 2025
- Major: BlogFunding
Mar 2025
- Major: BlogCommercial
About CoreWeave
CoreWeave
GPU cloud, AI data centers
CoreWeave is the largest specialist GPU cloud, renting NVIDIA GPU clusters to AI labs and big tech. It started as a crypto miner in 2017 and listed on Nasdaq in March 2025.
- Order backlog about $104B at end of June 2026. 2026 revenue guidance is $12.4-13.2B.
- Big customers include OpenAI, Microsoft and Meta.
- Plans $35-39B of 2026 spending, funded largely with debt.
- Founded
- 20179 yrs
- Headquarters
- United States
- Status
- Public
- Listed
- CRWV (opens google.com)NASDAQ
- Valuation
- $48Bmarket capAug 2026
- Last round
- IPO · $1.5BMar 2025
- Coverage
- 1 program · 6 updateslatest 11 Aug 2026checked 25 Sep
- Suppliers
- NVIDIA
- People
- Michael IntratorCo-founder and CEO