# BYD to supply 11.275 GWh of Haohan storage to Masdar's round-the-clock solar project in Abu Dhabi

Canonical page: https://technooptimist.io/stories/byd-to-supply-11-275-gwh-of-haohan-storage-to-masdar-s-round-the-clock-5e052ebb
Date: 9 Jul 2026
About: [BYD](https://technooptimist.io/companies/byd.md) · [Haohan / MC Cube grid storage](https://technooptimist.io/energy/byd-grid-storage.md)
Original source: https://cnevpost.com/2026/07/10/byd-11-275-gwh-storage-deal-abu-dhabi-project/

BYD signed an 11.275 GWh agreement with Masdar to supply Haohan batteries for the Round The Clock project in Abu Dhabi, developed with utility EWEC and billed as the first gigawatt-scale renewable plant meant to deliver steady power day and night. Storage is what turns daytime solar into round-the-clock baseload.

## Key facts

- Haohan units rated for -30 °C to 55 °C with IP66 protection, suited to desert heat and dust.
- BYD's GC Master software manages single sites beyond 15 GWh.
- The same month BYD's MC Cube went live at a 99.8 MW / 288.6 MWh Greenvolt site in Hungary.

---

The Techno Optimist tracks every frontier of technology, program by program: https://technooptimist.io/ (a Markdown version of any page: add .md to its URL; site map for agents: https://technooptimist.io/llms.txt).
Data API (JSON, realtime stream): https://technooptimist.io/developers. People read 5 pages free, then Reader $10/month; these Markdown pages are open to agents.
