Goal: Rebuild a rare-earth supply chain outside China starting from the ore. Mountain Pass mines, concentrates and separates rare earths on site and is adding the dysprosium and terbium that heat-resistant magnets need.
Status: 840 t NdPr in Q2 2026; Dy/Tb circuit commissioning, first heavy rare earths due late 2026.
Next milestone: Dy/Tb separation circuit commissioning, target 2026

## Milestones

| Status | Milestone | Date | Slip |
| --- | --- | --- | --- |
| Done | Mine closes after waste spill and Chinese competition | 2002 |   |
| Done | MP Materials' owners buy the mine out of bankruptcy | Jul 2017 |   |
| Done | Mining and concentrate production resume | Jan 2018 |   |
| Done | DoD deal: $110/kg NdPr floor, $400M equity, $150M loan | Jul 2025 |   |
| Done | All product sales to China stop | Jul 2025 |   |
| Done | Price-floor payments start | Oct 2025 |   |
| Current | Dy/Tb separation circuit commissioning | 2026 |   |
| Planned | First dysprosium and terbium shipped to Fort Worth | Q4 2026 |   |
| Planned | New pre-flotation process at full scale | 2028 |   |

## Upcoming events

- **2026**: Dy/Tb separation circuit commissioning
- **Q4 2026**: First dysprosium and terbium shipped to Fort Worth
- **Nov 2026**: Q3 2026 NdPr production expected above 1,000 t
- **2028**: New pre-flotation process at full scale

## Most important updates

- **6 Aug 2026**: Mountain Pass NdPr output up 41% to 840 t; MP commissioning its dysprosium-terbium circuit. MP produced 840 tonnes of NdPr in the second quarter of 2026 and sold 1,006 tonnes, while rare-earth oxide output fell 16% because of a scheduled maintenance outage and pilot testing. ([our story](https://technooptimist.io/stories/mountain-pass-ndpr-output-up-41-to-840-t-mp-commissioning-its-845020a4.md) · [original source](https://mpmaterials.com/news/mp-materials-reports-second-quarter-2026-results))
- **6 Nov 2025**: MP Materials posts record NdPr output, ends sales to China and sets mid-2026 start for heavy rare-earth separation. Mountain Pass made a record 721 tonnes of NdPr in the third quarter of 2025, up 51% on a year earlier, after MP stopped all product sales to China. ([our story](https://technooptimist.io/stories/mp-materials-posts-record-ndpr-output-ends-sales-to-china-and-sets-mid-35913e58.md) · [original source](https://mpmaterials.com/news/mp-materials-reports-third-quarter-2025-results))
- **10 Jul 2025**: MP Materials and the US Defense Department agree a $110/kg NdPr price floor, $400M equity and heavy rare-earth loan. The Defense Department agreed to a 10-year price floor of $110 per kilogram for MP's NdPr products, a $400 million preferred stock purchase that would make it MP's largest shareholder, and a $150 million loan to expand heavy rare-earth… ([our story](https://technooptimist.io/stories/mp-materials-and-the-us-defense-department-agree-a-110-kg-ndpr-price-18387dc6.md) · [original source](https://investors.mpmaterials.com/investor-news/news-details/2025/MP-Materials-Announces-Transformational-Public-Private-Partnership-with-the-Department-of-Defense-to-Accelerate-U-S--Rare-Earth-Magnet-Independence))

## Current obstacles

- **Ramping the refinery**: Separated products cost more per unit than concentrate while the refinery is under-used; Q2 2026 output was also cut by a maintenance outage and pilot testing.
- **Restarting the chlor-alkali plant**: MP is recommissioning an idle on-site plant that makes its own process chemicals; the savings build only through 2027.

## Physics limits

- **Rare earths are chemically near-twins**: Neighbouring rare earths behave almost identically in solution, so separation needs long chains of extraction stages, lots of reagent and tight control.
- **Light-rich ore, few heavies**: Bastnäsite is dominated by light rare earths; the 200 t/yr Dy/Tb circuit is tiny next to NdPr output, so heavy supply depends on outside feed.

## How it works

### Mine: Open pit in carbonatite

Ore rich in bastnäsite, a rare-earth carbonate mineral, is blasted, crushed and floated into a concentrate.

### Separation: Solvent extraction on site

Concentrate is dissolved and passed through many liquid-liquid extraction steps that split chemically near-identical elements into NdPr oxide.

### Heavy circuit: Dysprosium and terbium

A heavier rare-earth fraction (SEG+) stockpiled since late 2023, plus outside feed, goes to a new circuit for Dy and Tb, then samarium.

### Downstream: To the magnet plant

Oxides go to MP's Independence plant in Fort Worth to be made into metal and NdFeB magnets.

## Spec sheet

| Spec | Mountain Pass mine and separation | Provenance |
| --- | --- | --- |
| NdPr oxide output (Q2 2026) | 840 t | reported |
| Rare-earth oxide output (Q2 2026) | 11,072 t | reported |
| Dy/Tb circuit nameplate | 200 t/yr | reported |
| Heavy rare-earth plant feed | ~3,000 t/yr | reported |
| DoD NdPr price floor (10 years) | US$110/kg | reported |
| Ore reserve grade (2020) | 7.06% rare-earth oxide | reported |
| Ore reserve (2020) | 18.9 Mt ore, 1.36 Mt REO | reported |
| Share of world output (2020) | 15.8% | reported |

Provenance: reported = stated by the company; estimated = our estimate; sample = a sample figure.

## About MP Materials

MP Materials owns Mountain Pass, North America's only major rare earth mine. It manufactures magnets at Fort Worth and plans the 10X campus in Texas.

- Mountain Pass is North America's only large-scale rare earth mine and processing facility.
- Fort Worth Independence began magnet production January 2025 at 1,000 metric tons per year.
- 10X campus (2028) will add 10,000 metric tons/year backed by a US Department of War partnership.

- Founded: 2017
- Headquarters: US
- Status: public
- Listing: MP (NYSE)
- Last round: SPAC merger (Fortress Corp), 2020
- Website: https://www.mpmaterials.com
- People: James Litinsky (CEO)
- Partners, customers, investors: General Motors (customer); US Department of War (partner)

Company page: https://technooptimist.io/companies/mp-materials.md

## Related programs

More from MP Materials:

- [Independence Fort Worth Magnet Facility](https://technooptimist.io/materials/independence.md) (Deploy)

Everything in Materials: https://technooptimist.io/materials.md

---

The Techno Optimist tracks every frontier of technology, program by program: https://technooptimist.io/ (a Markdown version of any page: add .md to its URL; site map for agents: https://technooptimist.io/llms.txt).
Data API (JSON, realtime stream): https://technooptimist.io/developers. People read 5 pages free, then Reader $10/month; these Markdown pages are open to agents.