# SculptPrint large-format wire-arc printing by Lincoln Electric

Canonical page: https://technooptimist.io/manufacturing/sculptprint-waam
Frontier: [Manufacturing](https://technooptimist.io/manufacturing.md) · Field: Wire & sinter metal printing · Company: [Lincoln Electric](https://technooptimist.io/companies/lincoln-electric.md)
Stage: Deploy (4 of 5: Research → Proto → Pilot → Deploy → Scaling)
Updated: last update 2025-10-10, facts checked 2026-10-11
Goal: Replace castings and forgings that take many months to arrive with printed parts delivered in weeks, starting with the Navy submarine program, where late parts hold up boats.
Status: 26 cells in 24/7 production; four Navy co-funded cells printing submarine parts since late 2025.
Next milestone: Naval propulsion parts up to 20,000 lb (BPMI program)

## Milestones

| Status | Milestone | Date | Slip |
| --- | --- | --- | --- |
| Done | Acquires Baker Industries (machining, Michigan) | 2019 |   |
| Done | Bechtel Plant Machinery picks Lincoln for naval parts | 15 Feb 2024 |   |
| Done | Printed Soo Locks lever arm installed | 1 Mar 2024 |   |
| Done | Four SculptPrint 1500 cells for Electric Boat open | Oct 2025 |   |
| Current | Naval propulsion parts up to 20,000 lb (BPMI program) |   |   |

## Most important updates

- **10 Oct 2025**: Navy, Electric Boat and Lincoln Electric open four large wire-arc printing cells for submarine parts. Four SculptPrint 1500 wire-arc cells in Cleveland, funded partly by the Navy's Maritime Industrial Base Program, will print large metal parts for Electric Boat. ([our story](https://technooptimist.io/stories/navy-electric-boat-and-lincoln-electric-open-four-large-wire-arc-a463f757.md) · [original source](https://3dprintingindustry.com/news/large-scale-am-unlocks-new-capabilities-in-u-s-nuclear-submarine-production-245159/))
- **1 Mar 2024**: Printed 6,000-lb steel lever arm installed at the Soo Locks after an 18-month casting quote. A cracked 12-foot lever arm on the Soo Locks' ship arrestor was replaced with a wire-arc printed part in high-strength low-alloy steel. ([our story](https://technooptimist.io/stories/printed-6-000-lb-steel-lever-arm-installed-at-the-soo-locks-after-an-18-dd740f81.md) · [original source](https://3dprint.com/324351/when-castings-take-18-months-how-3d-printing-helped-fix-the-soo-locks/amp/))
- **15 Feb 2024**: Bechtel Plant Machinery picks Lincoln Electric to print naval propulsion parts up to 20,000 lb. Bechtel Plant Machinery, a prime contractor for the Naval Nuclear Propulsion Program, chose Lincoln Electric for a development program to print large propulsion components. ([our story](https://technooptimist.io/stories/bechtel-plant-machinery-picks-lincoln-electric-to-print-naval-e4892161.md) · [original source](https://mmsonline.com/news/lincoln-electric-partners-with-bechtel-plant-machinery-to-support-us-navy))

## Current obstacles

- **Naval qualification part by part**: Printed submarine and reactor-plant parts need test data the Navy accepts before each one replaces a casting.
- **No aluminium or titanium**: Lincoln doesn't offer them yet; it says the business case isn't there.

## Physics limits

- **Rough, oversize surfaces**: Weld beads are millimetres wide, so parts come out rough and oversize and must be machined; fine features and thin walls are beyond the process.
- **Heat builds stress**: Each pass re-melts and reheats the layers below, so large parts build residual stress and can distort; deposition must be paced and parts may need heat treatment.

## How it works

### Welding as printing: Beads of molten wire

A robot arm runs a welding torch that melts steel or nickel wire and lays beads layer by layer into a near-final shape.

### Positioner: The part moves too

A two-axis servo positioner turns and tilts the part under a six-axis ABB robot so the torch can reach every face.

### Path planning: SculptPrint OS

Lincoln's slicer turns the CAD model into torch paths and weld settings, with monitoring during the build.

### Scan and machine: From rough to exact

Every part is laser-scanned against CAD, then machined to final size; big parts are printed in sections and welded.

## Spec sheet

| Spec | SculptPrint large-format wire-arc printing | Provenance |
| --- | --- | --- |
| Wire-arc printers in Cleveland | 26, running 24/7 | reported |
| Largest part handled | 20,000 lb | reported |
| Single print size | About an 8-ft cube | reported |
| SculptPrint 1500 envelope | 526 × 478 × 440 cm | reported |
| Lead time vs casting | Up to ~80% shorter | reported |
| Speed vs casting/forging | Up to 8x faster (company) | reported |
| Alloys | Steels, 17-4 PH, nickel 617/625, Invar 36, 70/30 Cu-Ni | reported |

Provenance: reported = stated by the company; estimated = our estimate; sample = a sample figure.

## About Lincoln Electric

Cleveland maker of welding equipment and wire that also runs what it calls the world's largest wire-based metal 3D printing platform, printing multi-ton steel and nickel-alloy parts that would otherwise wait months for a casting.

- 26 robotic wire-arc printers in Cleveland run 24/7; one print can reach about an 8-ft cube.
- Four Navy co-funded SculptPrint 1500 cells (Oct 2025) print submarine parts for Electric Boat.
- Printed a 6,000-lb Soo Locks lever arm in about 3 months against an 18-month casting quote.

- Founded: 1895
- Headquarters: US
- Status: public
- Listing: LECO (NASDAQ)
- Website: https://www.lincolnelectric.com
- People: Mike Whitehead (President, Americas Welding)
- Partners, customers, investors: General Dynamics Electric Boat (customer); Bechtel Plant Machinery (partner); US Army Corps of Engineers (customer)

Company page: https://technooptimist.io/companies/lincoln-electric.md

## Related programs

Everything in Manufacturing: https://technooptimist.io/manufacturing.md

---

The Techno Optimist tracks every frontier of technology, program by program: https://technooptimist.io/ (a Markdown version of any page: add .md to its URL; site map for agents: https://technooptimist.io/llms.txt).
Data API (JSON, realtime stream): https://technooptimist.io/developers. People read 5 pages free, then Reader $10/month; these Markdown pages are open to agents.